June 2023
Received tenant lawsuit from a slip and fall occurring back in January 2020. Previous to corporate entity single owner at the time is handling with prior insurance company.
- First floor: $1,200 collected ($1,195 June, $5 Nov late fee)
- Second Floor: $1,395 collected
- Third floor: $1,264 collected
- First floor: $1,200 collected ($1,195 June, $5 Nov late fee)
- Second Floor: $1,395 collected
- Third floor: $1,264 collected
Major Costs Summary
- Unit 2: Bath sink drain replacement and snake $145
Next / Todo
- None
- None
May 2023
- First floor: $1,200 collected ($1,195 May, $5 late fees)
- Second Floor: $1,395 collected
- Third floor: $1,395 collected
- First floor: $1,200 collected ($1,195 May, $5 late fees)
- Second Floor: $1,395 collected
- Third floor: $1,395 collected
Major Costs Summary
- Unit 3: Interior door replacement: $165
Next / Todo
- None
- None
April 2023
Third floor tenant moved in. Performed plumbing work to re-locate pipes that were run across front entry way. This work was a known item that was identified during purchase but never scheduled. Now complete. HELOC was paid off and now stands at $0 balance.
- First floor: $1,200 collected ($1,195 April, $5 late fees)
- Second Floor: $1,395 collected
- Third floor: $1305 collected
- First floor: $1,200 collected ($1,195 April, $5 late fees)
- Second Floor: $1,395 collected
- Third floor: $1305 collected
Major Costs Summary
- Unit 3: Plumbing: $340
Next / Todo
- None
- None